| Term | Definition |
|---|---|
Foundations | Must transmit building loads to the rock or soil on which they rest. |
Dead Loads | Permanent loads that remain constant over time. |
Live Loads | Loads that change over time. |
Uniform Settlement | Settlement that may disrupt building services, entrances, or site elements without distorting the structure. |
Differential Settlement | Settlement that causes distortion and damage to finishes, cladding, and other building components. |
Earth Material | A construction material that is naturally heterogeneous and less predictable than manufactured materials. |
Rock | A continuous mass of solid mineral material that provides excellent foundation support. |
Soil | A particulate earth material whose behavior depends on particle size, shape, mineral content, and moisture. |
Index Properties | Physical characteristics used to identify and classify soils without directly measuring strength. |
Boulder | A soil particle too large to lift with one hand. |
Cobble | A soil particle that can be lifted with one hand. |
Gravel | Particles that can be lifted between the thumb and forefinger. |
Sand | Particles too small to be individually picked up between fingers. |
Silt | Fine-grained soil with roughly spherical particles that are too small to see individually. |
Clay | Soil particles smaller than silt with a plate-shaped structure. |
Organic Soils | Soils containing decomposed plant material such as humus, muck, or peat and generally unsuitable for foundations. |
Unified Soil Classification System USCS | A system used to classify coarse-grained, fine-grained, and organic soils. |
Coarse-Grained Soils | Non-cohesive soils whose strength comes from friction and interlocking of particles. |
Fine-Grained Soils | Cohesive soils whose properties are highly sensitive to moisture content. |
Shear Strength | The resistance of soil particles to sliding past one another. |
Cohesive Soil | Soil whose particles stick together because of electrostatic forces. |
Non-Cohesive Soil | Soil whose strength depends mainly on particle friction and interlocking rather than cohesion. |
Consolidation | The gradual compression of soil under sustained loads that causes long-term settlement. |
Shrinkage Limit SL | The water content below which further drying causes no additional volume reduction. |
Plastic Limit PL | The lowest water content at which soil remains plastic. |
Liquid Limit LL | The water content at which a clay soil changes from plastic behavior toward liquid behavior. |
Atterberg Limits | Tests used to determine the shrinkage, plastic, and liquid limits of soils. |
ASTM D4318 | Standard test procedure used to determine the plastic limit of soils. |
Well-Graded Soil | Soil containing a wide distribution of particle sizes. |
Well-Sorted Soil | Soil containing a limited range of particle sizes and typically more void space. |
Field Density Test | A test used to determine the in-place density of soil at a construction site. |
Sand Cone Method | A field density test that uses calibrated Ottawa sand to determine hole volume and soil density. |
Ottawa Sand | Uniform calibrated sand used in the Sand Cone density test. |
Nuclear Density Gauge | A device that measures in-place soil density and moisture using radioactive sources. |
ASTM D1556 | Standard governing the Sand Cone Method field density test. |
ASTM D2922 | Standard governing the Nuclear Method field density test. |
Maximum Dry Density | The highest dry density a soil can achieve under a given compaction effort. |
Optimum Moisture Content OMC | The moisture content that produces maximum dry density during compaction. |
Proctor Curve | A graph showing the relationship between dry density and moisture content. |
R. R. Proctor | The engineer who developed the concept of maximum dry density and optimum moisture content. |
Standard Proctor Test | A compaction test using a 5.5-lb hammer and ASTM D698 procedures. |
Modified Proctor Test | A higher-energy compaction test using a 10-lb hammer and ASTM D1557 procedures. |
ASTM D698 | Standard specification for the Standard Proctor Test. |
ASTM D1557 | Standard specification for the Modified Proctor Test. |
Soil Investigation | The exploration of subsurface soil conditions to evaluate foundation suitability. |
Invasive Soil Investigation | Methods involving direct penetration or excavation of the ground. |
Non-Invasive Soil Investigation | Geophysical methods that evaluate subsurface conditions without excavation. |
Soil Borings | Holes drilled into the ground to obtain soil samples and investigate subsurface conditions. |
Auger Borings | A soil investigation method using hand or power augers. |
Rotary Drilling | A drilling technique used for soil investigation and rock coring. |
Standard Penetration Test SPT | A drive-tube boring method used to evaluate soil resistance and properties. |
Shelby Tube Sampler | A device used to obtain relatively undisturbed soil samples. |
Dutch Cone Penetrometer | A tool used to evaluate soil resistance and subsurface conditions. |
Ground Penetrating Radar GPR | A geophysical method that uses radar waves to investigate subsurface conditions. |
DC Resistivity | A geophysical soil investigation technique based on electrical resistance. |
Seismic Refraction | A geophysical method that uses seismic waves to study subsurface layers. |
Seismic Reflection | A geophysical method that analyzes reflected seismic waves to identify subsurface features. |
Geotechnical Report | A report describing subsurface soils, properties, and laboratory testing results. |
Bearing Capacity | The ability of soil to support structural loads without failure. |
Structural Fill | Imported, well-graded coarse-grained soil used to improve site conditions and raise grades. |
Drainage Fill | Uniformly graded gravel used around foundations or beneath slabs to improve drainage. |
Benched Excavation | An excavation with sloped or stepped sides that is generally less expensive than sheeted excavation. |
Sheeted Excavation | An excavation supported with temporary retaining systems where space is limited. |
Tiebacks | Anchors extending into stable soil or rock to support excavation walls. |
Soldier Beams | Vertical structural members used to support excavation walls. |
Lagging | Timber or precast concrete panels placed between soldier beams to retain soil. |
Steel Sheet Piling | Interlocking steel sheets driven into the ground for earth retention and groundwater control. |
Dewatering | The removal or control of groundwater during excavation and foundation construction. |
Foundation | The part of a structure that transfers loads safely to supporting soil or rock. |
Shallow Foundation | A foundation located near the bottom of the substructure that transfers loads to near-surface soils. |
Deep Foundation | A foundation extending to deeper, more competent soil or rock. |
Spread Footing | A shallow foundation that supports individual columns or piers by spreading loads over a larger area. |
Strip Footing | A shallow foundation that supports continuous load-bearing walls. |
Slab-on-Grade Foundation | A concrete slab cast directly on prepared soil with thickened areas for support. |
Crawl Space Foundation | A shallow foundation with an elevated floor system above an open space. |
Basement Foundation | A fully enclosed below-grade space requiring waterproofing and drainage. |
Mat Raft Foundation | A large reinforced concrete slab supporting an entire structure and reducing differential settlement. |
Caisson Pier | A drilled deep foundation element reinforced and filled with concrete. |
Pile | A deep foundation element driven into the ground to transfer loads through end bearing and skin friction. |
End Bearing | Load transfer mechanism where piles rest on competent soil or rock. |
Skin Friction | Load transfer mechanism through friction between pile surfaces and surrounding soil. |
Pile Cap | A reinforced concrete element that distributes structural loads among a group of piles. |
Grade Beam | A beam spanning between piers or pile caps to support walls above. |
Mini Piles Pin Piles | Small piles pressed or rammed into the ground for stabilization and load transfer. |
Helical Piles | Screw-like piles installed by rotation to transfer loads to competent soils. |
Rammed Aggregate Piers | Ground-improvement elements made of compacted aggregate that strengthen weak soils. |
Underpinning | A process used to strengthen, repair, or replace an existing foundation. |
Drainage Mat | A material that allows groundwater to flow downward toward drainage systems. |
Drain Piping | Perforated pipe installed at foundation bases to collect and remove groundwater. |
Damp-Proofing | A coating that limits moisture penetration into concrete but does not resist hydrostatic pressure. |
Waterproofing | A system that prevents water penetration even under hydrostatic pressure. |
Waterstop | A material installed in concrete joints to prevent water passage between separate pours. |
Hydrostatic Pressure | Water pressure exerted against foundation walls below grade. |
Free-Draining Backfill | Granular material placed around foundations to promote drainage and reduce water pressure. |